The New Westminster Secondary School Replacement Project accommodates 1,900 grade 9 to 12 students. The school was designed to optimize the use of flexible learning spaces to maximize collaboration and active learning. Energy efficient mechanical system design includes heat recovery ventilators, demand control ventilation, and displacement ventilation systems.
Raymond Cho was the mechanical compliance engineer for School District 40 while at S+A Vancouver.